Shit, just thought :thinking: what are we going to do without anticipation of boxes and the big brown truck :stuck_out_tongue:
Been working on my “addition” will update build thread this weekend…hellz ya…I gained about 64 sq feet if my arithimatik is right :wink:

2 Likes

Has anyone received shipment notices today?

Hi Lisa, it is the D42IN. Good reviews from the research that I did. Heard very good things about it. NorthernTool Link…https://www.northerntool.com/shop/tools/product_200381448_200381448?gclsrc=aw.ds&&utm_source=google_PPC&utm_medium=NT%20DSA%20Feed&utm_campaign=DSA%20Feed&utm_content=&gclid=CjwKCAjwssD0BRBIEiwA-JP5rDk5AQ3Nccx_KYRSlrTmH4vsu69NIpJA-dupyXTlflSplQy1Di0-HxoCt1oQAvD_BwE&gclsrc=aw.ds

As far as the Compressor goes, I have it within about 5 to 8 feet of my main house panel with its own 220 breaker setup. Now the plasma table I guess can be anywhere you have an air bib to hook to your plasma cutter. I made a heavy duty extension cord for me to be able to hook to the the plasma cutter itself. My son and I are working out of our garage right now so I have no other outlets except a couple of 110v. Does you shop have a 220 outlet near where you are going to put the table. if not you will have to make a heavy duty extension cord like I did to the keep the voltage drop down.

Sam

2 Likes

Dang, I need to get some of that too…J did you figure out how much you will need for the table. what is going to be the ratio/gallons needed.

I got a notice yesterday that box 4 will be here Monday…its the laptop stand and attachment.

1 Like

Haven’t heard the normal chatter about boxes going out. Anyone hear anything shipping related this week? A couple weeks ago they were pushing accessories out the door… after that… ???

we just moved to Arkansas and moved our shop…starting with a clean slate…just poured concrete and will order the electric service to the workshop next. We can do the electric runs ourselves, so either I can put a small sub panel over by the machine or bring the machine closer to that side of the shop…not sure yet. my husband did have the compressor near the panel like you said and we will do that again for sure… we are going to bring other equipment in too, so I have to do some careful space planning.

I forgot we need 220 for the table…lol…just excited too…we got water table delivered the other day!

1 Like

It’s a 20:1 ratio (water to green cut) I ordered 8 - 1 liter bottles which is more then enough to make several “batches” for the water table. Only downfall if you can even call it that is it takes a while once ordered to ship and receive since it’s coming from Canada.

Roger roger. Sounds good

Wow, that looks like an 80 Gallon tank. It might already have an aftercooler on it.

You don’t need 220 for the table. The table uses 110/60hz (except overseas where it’s 220/50hz). You need 220 if your plasma does and if your compressor needs it. Your PC & table are good on 110.

1 Like

Just got an email about Box 2 has shipped!!! It’s getting closer! Now to finish welding the water table up and I should be ready for Box 2 & 1 :sunglasses:

I just got the laptop stand today.

All I need now is the THC, Box 1 and box 2

J what order number are you?

1 Like

FYI…his order # 9183. I was curious too and looked it up.

1 Like

Order # 9181 Box 2 shipped.

Items in this shipment

CrossFire PRO - Box 2 of 3 - Electronics, Hardware × 1

1 Like

Ugh, that makes me think I’m months off. I got box 3 last week. Order #12023

#9183 is correct!

13806… I better find a different hobby short term :smile:

I got box 3 on April 3 and notice of box 2 shipping today