THC Issue or Machine Setting issue?

Check out the 2 commands on the left in the operations window (the “G” and the arrow thingy)

sc-gcode

To do a pause like what you are talking about if you have operations separated by layers, put a G-Code M0 command between each operation.

To do a move - use the “move to a given coordinate” as needed.

When you post process, these steps will be :built in" to your job.

Hope that helps!

1 Like