Got machine yesterday and assembled base last night. Poured concrete this morning.
I did it solo with cement mixer and everything lined up ready to go. Worked out pretty well. With that said, I would not advise doing it by yourself. I have done more than a few projects mixing and finishing on my own. I’m not the best at finishing, so glad there will be epoxy going on top.
SoCal… it is a nice view, but I was just taking pics of stuff. It’s nice for when I ‘F’ something up in the shop I can look outside and take moment instead of throwing my tools.
Did my flood coat this morning, seal coat late last night.
Due to the type of concrete I used, I was at 4000+ PSI at the end of day 3. Spent last 2 days assembling. Yes, I am out of order. Still needed the 5 days to make sure water was evaporated out of concrete.
I didn’t realize how much of the enclosure was lexan. It looks like the visibility will be excellent. Your shop appears to be well lit too so that helps.