Starting a Parts list ***** Am I missing any parts? *****
$?.?? (Qty 4) (80" length) 2x2-14ga Galvanized Square Tubing (Contacting my local supplier in the morning) (51.5" + added cut length 30") ← Pb1011 how long are your rails?
$?.?? (Qty 1) 2x2 (63 13/16" length) 14ga steel tubing for cross bar
$0.00 (Qty 2) 2x2 (28 5/16" length) repurposed 2x2 from the original rails
$90 (Qty 2) Leed screws Fast-Travel, Right-Hand, 1/2"-10 Thread, 6 Feet Long, 5:1 Speed ACME lead screw
$100 (Qty 1) 14ga 48"x96" sheet of mild steel
$50 (Qty 2) 1# High temp powder coat
$55.00 (Qty 3) x axis lead nuts (getting 1 extra as a back up
*** Water table plans ***
***** Probably the best water table set up I have seen *****
Bansheeman213
Does anyone have a better example of a water table or upgrades I should include?
I’m going to do a single piece table, powder coated with a Prismatic high temp powder (rated for 950 degrees). I’m also going to do all the upgrades Bansheeman213 did.
?? Stanchions ??
I was thinking about making the Stanchion plates taller.
— Any thoughts on that? It would give more room to make the water pan deeper and more room to cut taller items if not using the slates (retangle tube and round pipe.
After reading many post definately increasing the stancions by at least 2".
— Any thoughts reason to go more than 2"?
Thanks for any help with this. I have a batch of metal to cut over the next several weeks. I’m going to start getting these parts purchased. I will build my table last so that it is no longer than needed and document the process in a new post which I will add a link here.